







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Company in Everman, TX
Adding an ADU, a room addition, or a full home addition in Everman means working with 50-foot-wide lots, mid-century houses, and North Texas clay soil. Most of the homes here were built between the 1950s and 1980s, and the detached garages that came with them are now becoming guest suites, rental units, and home offices. We’re Sutton ADU Fort Worth, and we build these projects with a written price locked in before any work starts, plus a 365-Day Done Right Promise on every job. Call (682) 255-2399 to talk through what’s possible on your Everman lot.
Why Everman Homes Are Different

Everman’s housing stock is modest and well built for its era, but it was never designed for accessory dwellings. The typical property is a brick veneer or wood-frame home on a 50-by-100-foot lot, often with a detached garage at the back of the yard. That garage matters. Local inspectors regularly see ADU conversions where the overhead door opening is filled in, a mini-split system is added, and the structure becomes a small apartment. The original slab or pier-and-beam foundation usually needs evaluation first, because the clay-heavy soil in this part of Tarrant County shifts with rain and drought cycles.
The climate pushes the design conversation in specific directions too. Hot, humid summers mean cooling load matters more than heating, and severe spring storms make storm-resistant windows, proper anchoring, and moisture management non-negotiable. We plan Everman projects around these realities from day one, not as an afterthought.
Our Main Everman Services
Everman homeowners tend to call us about three things: converting an existing structure, building a new detached unit, and expanding the main house. Each service has its own dedicated Everman page, linked below.
Home Addition Contractor in Everman
Most Everman home additions are ground-level expansions on concrete slab foundations, and that’s actually good news: slab work in this area is well understood by local inspectors and moves quickly once permits clear. The bigger question is usually setback compliance on a 50-foot lot, where even a modest addition has to respect the gap between the structure and the property line. We handle the site survey, foundation plan, framing, roofing, and finish work so the addition ties into the existing brick veneer without looking bolted on. Home Addition Contractor in Everman covers full scope and pricing for this work.

ADU Builders in Everman
Detached ADUs in Everman often start with one of two paths: a factory-built unit from Dvele, Mighty Buildings, or Plant Prefab placed on a prepared site, or a stick-built studio that goes up in the back corner of the lot. Both routes require careful foundation work because of that shifting clay soil, and both benefit from mini-split cooling sized for a small footprint rather than an oversized traditional system. We walk you through the tradeoffs in real numbers before you commit. Details are on the ADU Builders in Everman page.

Room Addition Contractor in Everman
A room addition in Everman is usually a bedroom, a home office, or a second living space, and it typically attaches directly to the existing framing. The older homes here sometimes have pier-and-beam foundations that need leveling or supplemental support before we tie in new construction. That’s a known Everman condition, not a surprise we discover mid-project. We price it up front and show you the line items. The full breakdown is on Room Addition Contractor in Everman.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Brands We Service in Everman
We work with factory-built systems from Dvele, Mighty Buildings, and Boxabl, and we stock common replacement parts and trim locally in the Fort Worth metro so scheduling doesn’t stall. If you’re weighing a prefab ADU against a site-built one, see our brands for what each platform handles well in a North Texas climate.
Pricing for ADU Company in Everman, TX
| Service | Typical range in Everman |
|---|---|
| Detached ADU, 400 – 600 sq ft (site work separate) | $180,000 – $260,000 |
| Detached ADU, 600 – 900 sq ft (site work separate) | $220,000 – $320,000 |
| Detached ADU, 900 – 1,200 sq ft (site work separate) | $280,000 – $400,000 |
| Garage conversion to ADU, 400 – 600 sq ft | $90,000 – $150,000 |
| Garage conversion to ADU, 600 – 800 sq ft | $120,000 – $190,000 |
| Room addition, 200 – 400 sq ft | $60,000 – $110,000 |
| Room addition, 400 – 600 sq ft | $90,000 – $150,000 |
| Home addition, 500 – 800 sq ft | $120,000 – $190,000 |
| Home addition, 800 – 1,200 sq ft | $170,000 – $260,000 |
| Site work, foundation, utilities (per project) | $15,000 – $60,000 |
What pushes price up in Everman? Pier-and-beam foundation repairs on older homes, tree removal on tight lots, and any extension of the existing HVAC system rather than a dedicated mini-split. Every project gets a written line-item price before work begins, and that price is what you pay – no change orders slipped in silently.
Neighborhoods We Serve in Everman
Everman is compact, so most of our calls come from the established residential streets between Everman Parkway and the railroad line, plus the newer pockets near the southern edge of town. Typical scheduling for an estimate runs within a few business days across the whole city.
- Central Everman, including the streets around Everman High School
- The older neighborhoods west of Everman Parkway
- The subdivisions south of Enon Avenue
- The areas off Shelby Road and toward Forest Hill
- Anywhere inside Everman city limits where detached garages are common
Service Area – Cities Near Everman
Our crews cover Everman and the surrounding Tarrant County communities. If you’re in Fort Worth, TX, Arlington, TX, North Richland Hills, TX, or Keller, TX, the same Sutton standards apply: written pricing, Threshold Verified crews, and the 365-Day Done Right Promise on every completed project.
Serving Everman, TX - Our Local Coverage Area
We’re based in the Everman area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Everman

We typically schedule Everman estimates within two to four business days. Because we coordinate scheduling from our Dallas-Fort Worth office, Everman homeowners aren’t waiting on a distant dispatch chain. Call (682) 255-2399 and you’ll speak with a live person who can book the visit.
Yes, ADUs, garage conversions, and room additions in Everman all require city permits, and we pull them as part of the project. The permit process can add time to the front end of a job, especially when foundation plans or setback variances are involved. We handle the paperwork and coordinate inspections so you don’t have to chase the city.
No. The price we give you before work begins is the price on the contract, and the 365-Day Done Right Promise covers workmanship for one full calendar year from completion. If something fails during that year, the second visit is free – no haggling, no fee. Call (682) 255-2399 for an exact quote on your Everman project.
What happens when you call
- 1A real person answersNo phone trees - talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Everman Customers Say
"Straight answers on what we could and couldn't do on our lot."
- Edwin H."Itemized estimate with allowances laid out. Final cost was within a hair of the quote."
- Naomi R."Every crew member was vetted and carried a badge, which matters when they are around your family for months. Tidy site every day."
- Daniel F.



