A Sutton company - serving Fort Worth, TX
A new modern detached ADU in a backyard
ADU Builders · Keller, TX

ADU Builders in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

14+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
A new sunroom addition with three walls of windows
A second-story addition that matches the existing roofline
A second-story addition with a balcony, matched to the original house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Keller

If you’re weighing a detached ADU in Keller, the realistic price for a turnkey build runs $180,000 to $320,000 for a one-bedroom or studio unit, before site work. A JADU carved out of existing square footage typically lands between $80,000 and $150,000. We’ll walk you through the Keller-specific approval path first, because here that’s the part that sinks timelines, and we’d rather tell you that now than hand you a surprise later. Call (682) 255-2399 to talk it through.

Call (682) 255-2399

We’re Sutton ADU Fort Worth, the ADU-specialist member of the Threshold Group family, founded in 2006. Miles Hartwell leads our team, and he’ll be the name on your written price before anything gets built. We serve Keller from the Dallas-Fort Worth metro office, with crews who work these streets weekly. That means we know what the Keller planning department asks for, and just as importantly, what your HOA’s architectural review committee will reject.

Why Sutton ADU Fort Worth Is Keller’s Preferred ADU Builders Company

A small deck outside a new ADU

Keller homeowners face a two-gate approval process that most builders in the metro don’t fully prepare for. The city has its own rules, then your HOA has a second set that can veto a city-approved plan. We file both, in the right order, with the right drawings. That sequence matters more than almost anything else on the calendar.

Every Sutton project starts with a written price before work begins. Not a range that drifts, not a verbal ballpark. A line-item number, signed, that doesn’t change unless you change the scope first. That’s the Threshold Standard. It also means the 365-Day Done Right Promise: if any defect in our workmanship shows up within one full calendar year of completion, we make it right at no charge. No haggling, no prorating, no fine print.

And every person who steps onto your Keller property has been background-checked and identity-verified. Before a crew arrives, you get their names and photos. At the door, they show a photo ID badge and wear a clean, marked uniform. That’s not a courtesy, it’s a stated policy, and it’s the reason a lot of parents, older homeowners, and people who work from home choose us to open their gate.

JADU in Keller

A JADU in Keller is a junior accessory dwelling unit, typically a bedroom converted from existing floor area with its own kitchenette and entrance, but it must stay attached to the main house and often under 500 square feet. For Keller homeowners, the JADU question usually comes down to this: does your HOA’s deed restrictions prohibit a second kitchen? Because many do, even when the city’s code allows it. We check that deed language before you spend a dime on plans and permits. A JADU here typically runs $80,000 to $150,000, depending on whether we’re reworking plumbing and adding an exterior door or fitting out a space that already has rough plumbing nearby.

When the Second Kitchen Is the Problem

Lots of Keller HOAs, particularly in the master-planned neighborhoods, write “no second kitchen” into their deed restrictions. That single clause kills more JADUs than any city rule. We review the CC&Rs before we draw plans, so you don’t end up with a city-approved permit and a unit your HOA will fine you for. Sometimes the fix is a kitchenette with no range and a smaller sink; sometimes the HOA won’t allow even that, and we’ll tell you honestly which one you’re dealing with.

What JADU Work Actually Involves

A JADU job usually includes framing or reframing a wall for the new entrance, adding a compact kitchenette with a sink, running a dedicated electrical circuit, and sometimes extending the HVAC to handle the new conditioned space. In a 1980s or 1990s Keller home, we’re often dealing with a slab-on-grade floor, which means plumbing lines run through the slab rather than a crawl space, so trenching and patching concrete is part of the job. We’ll give you a written scope that spells out the slab work separately, so the number you see is the number you pay.

ADU Plans in Keller

The bathroom inside a new ADU

ADU Plans in Keller are the permit drawing set and HOA submittal packet that get your detached unit legally buildable, and getting them right the first time matters more here than in any neighboring city. The city plan review checks setbacks, height, and foundation design, while the HOA review checks color, materials, roof pitch, and sometimes even the number of exterior fixtures. Both reviews run in parallel, but the HOA usually meets monthly, so a plan that misses a committee deadline adds four to six weeks, not days. Sutton prepares the full set, including the clay-soil foundation letter that Keller requires for detached structures. Plan sets for a Keller ADU typically land in the $4,000 to $8,000 range depending on site complexity and what the HOA demands, and that includes resubmittal if the committee kicks back a finish choice.

The Clay Soil Foundation Letter

Keller sits on expansive clay, which swells and shrinks with the seasons. The city won’t issue a permit for a detached ADU without a foundation design that accounts for it. That letter, from a licensed engineer, describes how the slab or pier system handles soil movement. We coordinate that before we submit, because without it the city kicks the plan back and you lose two to three weeks you’ll never get back in the construction calendar.

What the HOA Packet Needs

A complete Keller HOA submittal includes exterior elevation drawings, a materials board with actual samples, roof pitch in the drawing title block, and sometimes a landscape plan showing what the ADU footprint does to drainage. We assemble all of it. But here’s the Keller-specific part: we don’t start foundation work until the HOA’s architectural review committee signs off. That’s a scheduling discipline that saves you from a poured slab with the wrong siding color and a stop-work order.

Trusted Brands We Service in Keller

We work with recognized ADU product lines like Dvele, Mighty Buildings, and Boxabl, and we pair them with James Hardie exterior systems when the HOA calls for fiber cement. Keller HOAs often specify HardiePlank lap siding and a particular color palette, so we stock local finish samples and coordinate directly with the brand’s customer support to get the approvals your committee wants to see. Prefab and modular units move faster on-site, but they still need a compliant foundation and utility trenching here, which we handle under the same written price and 365-Day Promise.

Common ADU Builders Problems We See in Keller Homes

  • Foundation work started before HOA approval. This is the most expensive mistake in Keller. A crew pours the slab, the HOA rejects the siding color or roof style at the monthly meeting, and the project stalls mid-frame with a foundation already in the ground. We sequence foundation work after the review committee signs, every time.
  • City submittal missing the clay-soil foundation letter. Keller’s planning department will simply return the plan unreviewed if the geotechnical letter isn’t attached. That costs weeks, not days. We include it in the first submittal, engineered for the actual soil on your lot.
  • JADU built against a forbidden second kitchen. The city may allow a JADU, but the HOA’s deed restriction on a second kitchen makes it unpermittable under the HOA’s rules. We read the CC&Rs before drawing anything, so you know on day one whether a JADU is even viable.
  • Exterior finishes that violate the HOA’s material schedule. Keller HOAs are specific: HardiePlank in a given tone, a 6:12 hip roof, no aluminum windows on the street-facing elevation. We specify to the committee’s published standards, so your submittal gets approved on the first or second meeting, not the fourth.

Pricing for ADU Builders in Keller, TX

A detached ADU in Keller runs $180,000 to $320,000 for a studio or one-bedroom unit before site work, with most falling in the $220,000 to $280,000 range when we’re using a mid-grade finish package and a concrete slab. A JADU inside existing space lands between $80,000 and $150,000. Site work is separate and quoted after a lot visit, because a Keller lot with heavy clay or a tight drainage pattern costs more to prep than a flat, sandy lot in another part of the metro. Your written price includes every line item, and the free estimate is the moment you get that number, not a teaser. Call (682) 255-2399 and we’ll come see the lot.

We Also Serve Cities Near Keller

Our crews cover Keller plus the surrounding cities of North Richland Hills, Hurst, Fort Worth, and Arlington. Since dispatch is coordinated from the Dallas-Fort Worth metro office, scheduling a job in those areas doesn’t add a week to your start date. If you’re in Keller proper, we’re already on the local roads weekly. As part of our ADU Builders in Keller coverage, we’ll give you a straight answer on whether your HOA is likely to pass your plans.

Serving Keller, TX - Our Local Coverage Area

We’re based in the Keller area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Keller

Why Keller Chooses Sutton ADU Fort Worth

We set the standard for adu builders in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your adu builders handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu builders needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Keller - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Insulated the walls and ceiling properly. It stays comfortable even in July."

Tamika W. · Verified customer
★★★★★

"Detached unit with a small kitchen and bath. Windows and finishes were nicer than I expected for the budget."

Philip S. · Verified customer
★★★★★

"They handled the drawings and the permit paperwork for us. All I had to do was pick the finishes."

Rosa M. · Verified customer

More ADU services in Keller

Every build below starts the same way: a free site visit and a written price.

Getting started with Sutton in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Fort Worth team

A local crew that works across Fort Worth and the towns around it, to the same written standard as every Sutton location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Builders in Keller?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(682) 255-2399

Request a Free Estimate in Keller

Tell us about your adu builders needs - we'll respond within the hour.

By providing your information above, you confirm you have read our Privacy Policy and consent to being contacted by phone, email, or text about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch